BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Space Calendar - ECPv6.18.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://spacecalendar.com
X-WR-CALDESC:Events for Space Calendar
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Pacific/Honolulu
BEGIN:STANDARD
TZOFFSETFROM:-1000
TZOFFSETTO:-1000
TZNAME:HST
DTSTART:20250101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20261023
DTEND;VALUE=DATE:20261024
DTSTAMP:20261023T013619Z
CREATED:20261016T031233Z
LAST-MODIFIED:20261023T013619Z
UID:10001476-1792713600-1792799999@spacecalendar.com
SUMMARY:NASA Updates on Plans to Return the the Moon by 2028
DESCRIPTION:2pm ET\, NASA to provide an update on the agency’s plans to return American astronauts to the surface of the Moon by 2028.
URL:https://spacecalendar.com/event/nasa-updates-on-plans-to-return-the-the-moon-by-2028/
LOCATION:Low Earth Orbit (LEO)
CATEGORIES:Meeting / Conference / Symposium
ATTACH;FMTTYPE=image/jpeg:https://spacecalendar.com/wp-content/uploads/2026/10/Moon-for-featured-images.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20261029
DTEND;VALUE=DATE:20261030
DTSTAMP:20261016T030818Z
CREATED:20261016T030603Z
LAST-MODIFIED:20261016T030818Z
UID:10001474-1793232000-1793318399@spacecalendar.com
SUMMARY:ISS / U.S. EVA #100
DESCRIPTION:Astronauts Anil Menon and Joshua Kutryk will perform a 6.5-hour EVA to completely install and deploy iROSA #7 on the 2A power channel. \nOnce Spacewalk 101 concludes on November 5\, the 5-year power augmentation program will be officially complete\, restoring the station’s total capacity to 215 kilowatts \nLearn more about the International Space Station: https://nasa.gov/station\nRead the latest mission updates from the station: https://nasa.gov/blogs/spacestation/
URL:https://spacecalendar.com/event/iss-u-s-eva-100/
LOCATION:Low Earth Orbit (LEO)
CATEGORIES:Mission Milestone
ATTACH;FMTTYPE=image/jpeg:https://spacecalendar.com/wp-content/uploads/2026/08/ISS-Spacewalk-EVA-US.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20261105
DTEND;VALUE=DATE:20261106
DTSTAMP:20261016T030813Z
CREATED:20261016T030813Z
LAST-MODIFIED:20261016T030813Z
UID:10001475-1793836800-1793923199@spacecalendar.com
SUMMARY:ISS / U.S. EVA #101
DESCRIPTION:Menon and Kutryk will exit the Quest airlock again to install iROSA #8 on the 3B power channel. \nOnce Spacewalk 101 concludes on November 5\, the 5-year power augmentation program will be officially complete\, restoring the station’s total capacity to 215 kilowatts \nLearn more about the International Space Station: https://nasa.gov/station\nRead the latest mission updates from the station: https://nasa.gov/blogs/spacestation/
URL:https://spacecalendar.com/event/iss-u-s-eva-101/
LOCATION:Low Earth Orbit (LEO)
CATEGORIES:Mission Milestone
ATTACH;FMTTYPE=image/jpeg:https://spacecalendar.com/wp-content/uploads/2026/08/ISS-Spacewalk-EVA-US.jpg
END:VEVENT
END:VCALENDAR